To content
Fakultät Architektur und Bauingenieurwesen

Excursion

Befestigung des Steges © Ingo Münch ​/​ TU Dortmund

Wednesday, 15.09.2021

Construction botanical footbridge and test facility Kamen

The construction botanical footbridge is lifted by telescopic loader and heavy-duty slings at the cantilever tip in order to extend a tree anchor. Deformations and forces are measured and controlled for this purpose. Furthermore, Martin Zeller will demonstrate tree surgery measures, which can then be practiced by the participants themselves in the test field. This serves to maintain the plant, in which plants and technical elements grow together to form a load-bearing structure.


Excursion Report